Saratov – Gorkij gas pipeline
More info
Photo reports on the progress of projects and its completion



Saratov – Gorkij gas pipeline

The SGM Group has performed works at the first and the second start-up complexes of the upgraded Saratov — Gorky gas pipeline at the section Pochinki — Saransk.


Customer: Gazprom tsentrremont LLC
  • Gas pipeline length: 206.8 km
  • Pipe diameter: 720 mm
  • Pressure: 5.4 MPa

The Saratov – Gorky gas pipeline has replaced the old gas pipeline, which was built in 1960 and reached a high degree of wear out.The gas pipeline was built for the demands of Gazprom tsentrremont LLC within the Integrated Program for Reconstruction and Technical Modernization of Gas Transportation Facilities of PAO Gazprom.

An underground crossing across the Rudnya River with the length of 300 m was built in the course of construction.